AJ Electrical

Unit Refurbishment Thornaby

This project involved isolating original distribution equipment, disconnecting and removing a portion of existing power and lighting.

Then renewing the DB’s with Schneider load centre, renewing a sub main, fitting LED lighting with emergency and running metal tray around the perimeter of the unit to future proof the movement and addition of new equipment.

All machines associated with the new tenants were then installed, tested, inspected and commissioned.

Copyright © 2021 AJ Electrical